Drivers using the Taylor Bridge should expect delays Thursday night as maintenance work takes place.
Dawson Road Maintenance will be working on the bridge from 7 p.m. Thursday until 3:30 a.m. Friday.
During the work, traffic will be reduced to a single alternating lane, with vehicles guided by a pilot car.
Oversized and overweight loads wider than 3.85 metres will not be able to cross the bridge during the maintenance period and will have to wait until after 3:30 a.m.
Dawson Road Maintenance is advising operators of oversized loads to plan their trips outside the 7 p.m. to 3:30 a.m. work window to avoid lengthy delays.
The company apologizes for any inconvenience caused by the overnight work.






